Success Stories > Drive optimisation

Machine : Stone crusher
Challenge:
| Extension of the operating time of V-belts for the drive of a specific stone crusher .
|
Problem/ Requirements :
| So far, the standard V-belts or kraftbands had to be replaced regularly.
|
Solution : | After the changeover to the maintenance-free Optibelt RED POWER II high performance V-belts, these problems are a thing of the past. Four Optibelt RED POWER II S=C PLUS V-belts in SPC profile with a length of 5000 mm were chosen and installed.
|
Effects :
| The maintenance-free Optibelt RED POWER II V-belt has been in operation for over 17 months at 60 hours per week now – without any trouble.
|
Savings : | Before and after the installation the energy consumption was measured with a Fluke multimeter in order to determine the energy savings. In the calculation, a continuous load is assumed and estimated for a period of 3000 operating hours and a kilowatt hour rate of US$ 0.1428.
- Conveyor system no. 1 : 1.2 % savings realised = US$ 185.66 per year - mill no. 1 : 1.4 % savings realised = US$ 376.07 per year - Mansfield macerator no. 4: 5.2 % savings realised = US$ 2,892.15 per year .
|